FAQs

When will construction of the project begin? Construction is anticipated to commence in Fall 2019.
How long is construction anticipated to take? Construction is expected to take approximately two calendar years.
Will traffic and pedestrians have access to the bridge during construction? Two-way traffic and pedestrian access will be maintained through the construction zone.
Will the bridge be the same size and on the same alignment?The new bridge will be wider than the existing bridge. The existing alignment will be maintained.